
@article{ref1,
title="Intersection, diamond, and three-level diamond grade separation benefit-cost analysis based on delay savings",
journal="Transportation research record",
year="1989",
author="Rymer, Bruce and Urbanik II, Thomas",
volume="1239",
number="",
pages="23-29",
abstract="A method for determining when traffic flow should be grade separated would be an invaluable tool for the traffic engineer/planner. The results of this study facilitate choosing proposed grade separation improvements on the basis of an evaluation of the reduced delay benefits to the cost of a grade separation. This methodology can assist decision-makers in determining when grade separations are appropriate. The analysis is centered on the Federal Highway Administration's TRANSYT 7F model. An economic analysis that presents the benefit/cost methodology for ranking a grade separation project is included.     Record URL:        http://onlinepubs.trb.org/Onlinepubs/trr/1989/1239/1239-004.pdf<p /><p>Language: en</p>",
language="en",
issn="0361-1981",
doi="",
url="http://dx.doi.org/"
}