
%0 Journal Article
%T Foresight in snow planning
%J APWA reporter
%D 1991
%A Tunnock, G.
%V 58
%N 9
%P 14-20
%X In Ottawa-Carleton, population 625,000, new permanent snow disposal sites are being planned for five communities with a full build-out population of 365,000. Currently, between 3.3 and 13 million cubic feet of snow (1 and 4 million cu m.) are removed annually in the urbanized areas; the average recorded winter snowfall in Ottawa is 89 in. (227.3 cm).<p />
%G 
%I American Public Works Association
%@ 0092-4873
%U http://dx.doi.org/