TY - JOUR PY - 2009// TI - The Criteria Describing the Need for Highway Reconstruction Based on the Theory of Traffic Flows and Repay Time JO - Transport A1 - Beljatynskij, Andrey A1 - Kuzhel, Nina A1 - Prentkovskis, Olegas A1 - Bakulich, Olena A1 - Klimenko, Irina SP - 308 EP - 317 VL - 24 IS - 4 N2 - General data on the network of Ukrainian highways are presented. The analysis of design methods of highway reconstruction based on the theory of traffic flows and economic calculations of its repay time is made. The relationship between traffic intensity and speed is shown by considering the theory of traffic flows. The methods, taking into account the principle of effectiveness of highway reconstruction based on its repay time, are discussed. Keywords: highway, reconstruction, repay time, cost, transport, vehicle, traffic intensity, traffic flow, speed, capital investments, transport expenses
LA - SN - 1648-4142 UR - http://dx.doi.org/10.3846/1648-4142.2009.24.308-317 ID - ref1 ER -