TY - JOUR PY - 2005// TI - Some lessons learnt from the use of PRA during the design phase JO - International journal of critical infrastructures A1 - van Graan, Henriette A1 - Serbanescu, Dan A1 - Eloff, Louis A1 - Combrink, Yolanda SP - 287 EP - 292 VL - 1 IS - 2/3 N2 - The development of the pebble bed module reactor (PBMR) as a gas cooled thermal reactor type includes the use of probabilistic risk assessment (PRA) during the design phases. This paper presents some of the basic issues and results of the application of PRA in the design process and as part of the licensing process.

LA - SN - 1475-3219 UR - http://dx.doi.org/10.1504/IJCIS.2005.006125 ID - ref1 ER -