TY - JOUR PY - 1987// TI - Application of a process flow model to a shutdown nuclear plant probabilistic safety assessment JO - Reliability engineering A1 - Bley, D.C. A1 - Reuland, W.B. SP - 241 EP - 253 VL - 17 IS - 4 N2 - A process flow model of procedures performed during typical plant outages has been applied to supplement the usual accident sequence initiating events, such as loss of offsite power, in a probabilistic risk assessment model of a nuclear plant. This method models the time-dependent plant conditions and activities not encountered during power operations. The advantages of this method, a brief description of the model and a discussion of the resulting accident sequences for a shutdown plant are presented.

LA - SN - 0143-8174 UR - http://dx.doi.org/10.1016/0143-8174(87)90090-4 ID - ref1 ER -