TY - JOUR PY - 2011// TI - The research of technical system about safety management during the construction of the Beijing subway line 10 JO - Advanced materials research A1 - Zhang, Ai Jun A1 - Bai, Ming Zhou A1 - Xu, Zhao Yi A1 - Wang, Peng Cheng SP - 6373 EP - 6376 VL - 243-249 IS - N2 - Aiming at the safety management of the Beijing subway line 10 in the construction, the technical system research of safety management in the underground railway engineering construction were discussed including the objective management of safe production, field safety standards, the founding method for safety management system. The contents of responsibility system for safe production and the contents of safe-education and safe-inspection for workers were also studied. Safety precautions and Safe checkage standards were established during the railway's tunnel construction.
LA - en SN - 1022-6680 UR - http://dx.doi.org/10.4028/www.scientific.net/AMR.243-249.6373 ID - ref1 ER -