TY - JOUR PY - 2017// TI - Consequence modeling at the Eastman Kingsport site JO - Process safety progress A1 - James, Michael A1 - Skelton, David SP - 338 EP - 352 VL - 36 IS - 4 N2 - The intent of this paper will be to review the methods utilized at the Eastman Kingsport site in determining magnitude of consequences of toxic, thermal, and blast overpressure scenarios. This will include discussion on dispersion modeling, dose-response methods for toxic, and thermal probits as well as assessing occupant vulnerability through the use of BakerRisk's Explosion Risk Cooperative tools. © 2017 American Institute of Chemical Engineers Process Saf Prog 36: 338-352, 2017
Language: en
LA - en SN - 1066-8527 UR - http://dx.doi.org/10.1002/prs.11908 ID - ref1 ER -