TY - JOUR PY - 2017// TI - Approximate the scheduling of quay cranes with non-crossing constraints JO - European journal of operational research A1 - Zhang, An A1 - Zhang, Wenshuai A1 - Chen, Yong A1 - Chen, Guangting A1 - Chen, Xufeng SP - 820 EP - 828 VL - 258 IS - 3 N2 - In port container terminals, the scheduling of quay cranes (QCs) for a container vessel is one of the most critical operations. This paper investigates the problem of scheduling quay cranes with non-crossing constraints, wherein QCs cannot cross over each other because they are on the same track. The objective is to minimise the makespan of a container vessel, which is the latest completion time among all handling tasks of the vessel. Compared with several 2-approximation algorithms in the literature, this paper presents an approximation algorithm with a worst case ratio 2−2m+1<2 for any m QCs. This ratio is demonstrated to be the best possible among all partition-based algorithms in the literature. Besides, we study the scheduling of two quay cranes with different processing speeds. For an arbitrary speed ratio s ≥ 1, an approximation algorithm with worst case ratio (1+s)21+s+s2 is provided.
Language: en
LA - en SN - 0377-2217 UR - http://dx.doi.org/10.1016/j.ejor.2016.10.021 ID - ref1 ER -