TY - JOUR PY - 1976// TI - Highway ramp merging examined by simulation JO - Australian road research A1 - Salter, RJ A1 - El-Hanna, FIH SP - 30 EP - 39 VL - 6 IS - 2 N2 - The paper describes field observations at a ramp merging situationĀ and the subsequent computer modelling of the operation of a typical yield and hesitate entrance ramp and also a ramp-merging control system. The gap acceptance mode of control was studied and compared to the uncontrolled condition. Criteria for comparison included: the numbers of vehicles merging with the motorway stream without delay; the average time spent by ramp vehicles on the acceleration lane; and the average speed of motorway vehicles on the acceleration lane; and the average speed of motorway vehicles at the end of the simulated section. On these criteria, gap acceptance control was found to be more effective than the uncontrolled condition.

Language: en

LA - en SN - 0005-0164 UR - http://dx.doi.org/ ID - ref1 ER -