SAFETYLIT WEEKLY UPDATE

We compile citations and summaries of about 400 new articles every week.
RSS Feed

HELP: Tutorials | FAQ
CONTACT US: Contact info

Search Results

Journal Article

Citation

Yildirim V, Yomralioglu T, Nisanci R, Çolak HE, Bediroğlu, Saralioglu E. Struct. Infrastruct. Eng. 2017; 13(5): 567-580.

Copyright

(Copyright © 2017, Informa - Taylor and Francis Group)

DOI

10.1080/15732479.2016.1173071

PMID

unavailable

Abstract

In accordance with current demands, the natural gas transmission pipeline (NGTP) is one of the most appropriate methods used in the distribution of existing reserves. Construction of long-distance pipelines requires large expenditures. Decreasing the time and cost of such construction and minimising environmental damage depend upon identifying the optimum routes from the onset of the project. Route determination is one of the most important steps in NGTP projects. The route determination process requires obtaining the existing graphic and non-graphic data from different institutions and organisations, as well as gathering, storing, querying and analysing non-existing data in an appropriate and efficient manner. Accessing the correct results rapidly by analysing such large data-sets can be achieved with spatial multicriteria decision-making technologies based on the geographic information system as an effective decision support tool. In this study, three methods were implemented for two NGTP projects of 103.60 and 60.89 km in length. At the end of this study, it was concluded that Spatial technique for order preference by similarity to ideal solution was the most effective of the three pipeline routing methods and that it could reduce project costs by approximately 21%.

Keywords: Pipeline transportation


Language: en

Keywords

geographic information systems; multicriteria decision-making; natural gas pipelines; routing; Spatial analysis

NEW SEARCH


All SafetyLit records are available for automatic download to Zotero & Mendeley
Print