SAFETYLIT WEEKLY UPDATE

We compile citations and summaries of about 400 new articles every week.
RSS Feed

HELP: Tutorials | FAQ
CONTACT US: Contact info

Search Results

Journal Article

Citation

Fu H, Guo X, Wu P, Wang T, Guo Y, Li J. Cold Reg. Sci. Technol. 2020; 177: 103103.

Copyright

(Copyright © 2020, Elsevier Publishing)

DOI

10.1016/j.coldregions.2020.103103

PMID

unavailable

Abstract

Ice blasting with explosives before the spring breakup of river sections is a preventive measure for ice flooding. Based on 496 datasets on ice cover blasting with No. 2 emulsion rock explosives measured in the Mohe reach of the Heilongjiang River from 2015 to 2018, we analyzed the relationships between the blasting-crater diameter and water depth below the ice and between the blasting-crater diameter and the explosive-placement depth below the ice. Further, we analyzed the functional relationship between the explosive weight of a single blast hole and the blasting-crater diameter. Based on the above analysis we proposed an equation to calculate the minimum blasting cost for the same blasting effect. Using a 5-km section of the Heilongjiang River as an example, the proposed optimization method can save ~46% of the total blasting cost while achieving the same blasting effect. Through prototype observations of the Longdao Wharf and the Shengdan Village sections of the Mohe reach, Heilongjiang River, we confirmed that ice blasting can significantly accelerate the melting of ice. Moreover, data records showed that no significant ice-jam flooding has occurred in this section of the Heilongjiang River during the spring ice breakup period in the past five years of consecutive blasting.


Language: en

Keywords

Blasting cost; Ice blasting; Ice flooding; Ice jam; Prototype observation

NEW SEARCH


All SafetyLit records are available for automatic download to Zotero & Mendeley
Print