SAFETYLIT WEEKLY UPDATE

We compile citations and summaries of about 400 new articles every week.
RSS Feed

HELP: Tutorials | FAQ
CONTACT US: Contact info

Search Results

Journal Article

Citation

Jones JS, Brown RE. Transp. Res. Rec. 1978; 684: 28-36.

Copyright

(Copyright © 1978, Transportation Research Board, National Research Council, National Academy of Sciences USA, Publisher SAGE Publishing)

DOI

unavailable

PMID

unavailable

Abstract

A brief introduction to artificial ground freezing for temporary excavation retention during construction is presented. The major aspects that affect the suitability of ground freezing in a particular project are discussed. To illustrate the applicability of artificial ground freezing, a case history in Washington, D.C., is presented. The project consisted of a circular 3.8-m (12.5-ft) diameter sewer tunnel approximately 33.5 m (110 ft) in length that passed 2.7 m (8.9 ft) beneath four sets of railroad tracks. The design process, including the frozen-soil laboratory testing program and the computer modeling, is presented. An instrumentation program was used during construction to monitor the performance of the project. The instrumentation consisted of thermocouples to monitor ground temperatures and elevation monuments to monitor ground movement during construction.

NEW SEARCH


All SafetyLit records are available for automatic download to Zotero & Mendeley
Print