SAFETYLIT WEEKLY UPDATE

We compile citations and summaries of about 400 new articles every week.
RSS Feed

HELP: Tutorials | FAQ
CONTACT US: Contact info

Search Results

Journal Article

Citation

Rivard PJ, Kohuska A. Can. Geotech. J. 1965; 2(3): 198-211.

Copyright

(Copyright © 1965, National Research Council of Canada)

DOI

10.1139/t65-027

PMID

unavailable

Abstract

The Shellmouth Dam on the Assiniboine River is a flood control project now being built by the federal and Manitoba governments. The upper 50 ft. of foundation at the dam site is a medium to highly plastic alluvial clay deposit containing sand layers and lenses. This is underlain by up to 100 ft. of sands and gravels to shale bedrock.This paper describes the design, construction, and instrumentation of a test fill built at the site of the proposed dam, and includes summaries of pore pressure and movement observations, settlement studies, and stability analyses.


Le barrage " Shellmouth ", financé par le gouvernement fédéral et par le gouvernement de Manitoba, sera construit sur la rivière Assiniboine et servira comme contrôle d'inondation. La fondation supérieure se compose d'une cinquantaine de pieds d'argile alluvial ayant une plasticité variant de moyenne à élevée, et contient aussi des couches et des lentilles sableuses. Directement en-dessous se trouve une centaine de pieds de sable et de gravier, et ensuite le schiste argileux.Cet article décrit le dessin, la construction, et l'instrumentation d'un essai de remblayage construit à l'endroit précité. Il résume en outre les observations de pression interstitielle, de déplacement, de tassement, et aussi les études d'analyses de stabilité.


Language: en

NEW SEARCH


All SafetyLit records are available for automatic download to Zotero & Mendeley
Print