SAFETYLIT WEEKLY UPDATE

We compile citations and summaries of about 400 new articles every week.
RSS Feed

HELP: Tutorials | FAQ
CONTACT US: Contact info

Search Results

Journal Article

Citation

Koteš P, Brodňan M, Chandoga M, Bacíková T, Kubissa W. Roads Bridges (Warsaw) 2017; 16(3): 177-190.

Copyright

(Copyright © 2017, Road and Bridge Research Institute (IBDiM))

DOI

10.7409/rabdim.017.012

PMID

unavailable

Abstract

Bridges are and have been designed on lifetime basis, as given in standards applicable at the time of design. The design lifetime for newly designed bridges as given in Eurocodes is 100 years and according to the old Slovak standard it was 80 years only. The first generation of prestressed concrete bridges have been used in Slovakia (formerly part of Czechoslovakia) starting from 1950s, and thus, according to old standards, they approach the end of their design lifetime. Nowadays, due to insufficient maintenance, many of them are in unsatisfactory condition. This paper focuses on the condition survey of the bridge on the road No. I/18 - in the part "Zlatné" of village Strečno and on the design of immediate remedial works which were necessary due to its potentially dangerous condition. Moreover, the design of restoration is also described.


Language: en

Keywords

beton; bridge; concrete; condition survey; dangerous condition; diagnostyka; monitoring; monitoring (bieżąca obserwacja) obiektów mostowych; most; prestressing; remont; restoration; sprężanie; stan awaryjny

NEW SEARCH


All SafetyLit records are available for automatic download to Zotero & Mendeley
Print