SAFETYLIT WEEKLY UPDATE

We compile citations and summaries of about 400 new articles every week.
RSS Feed

HELP: Tutorials | FAQ
CONTACT US: Contact info

Search Results

Journal Article

Citation

Liu Y. Fire Sci. Technol. (Beijing) 2022; 41(9): 1223-1227.

Copyright

(Copyright © 2022, Xiaofang Kexue yu Jishu)

DOI

unavailable

PMID

unavailable

Abstract

Through the method of measurement and simulation, two collaborative smoke exhaust schemes of "rail top exhaust hot air duct" and "smoke exhaust duct", are studied and compared. The results show that, the schemes of "rail top exhaust hot air duct" is effective. In the study of 8A station, the side smoke exhaust flow accounts for more than 50% of the total smoke exhaust flow, and the air leakage flow of metro platform screen door is close to 20 m3/s. The downward wind speed at the stairs can reach much higher under the schemes of "rail top exhaust hot air duct". However, under the schemes of "smoke exhaust duct", there is a risk that the wind speed can't reach the standard when the opening area of stairs is pretty large, because of tunnel fans in power off state. It is recommended to give priority to the scheme of "rail top exhaust hot air duct" when the station conditions are poor.

http://www.xfkj.com.cn/EN/Y2022/V41/I9/1223


Language: en

NEW SEARCH


All SafetyLit records are available for automatic download to Zotero & Mendeley
Print